Exceed Africa Projects

Exceed Africa provides excellence in environment engineering and development, by creating balance between hard engineering and each environment.

Often an environmentally engineered solution is more cost effective while allowing an enhanced user amenity as a by product.

The Reid (Linbro Park Ext.169)

  • Client – Balwin Properties Ltd
  • Duration – July 2016 to present
  • Contractor – Balwin / Probuild Construction
  • Development – 1294 Unit Residential Development
  • Engineering
    • Civil services – internal water, sewer, stormwater, platforms and roads
    • Structural Services – foundations, columns, gatehouse and clubhouse
    • Environment Services – large wetland rehabilitation and amenity with in-stream attenuation to create habitat for fauna and retain flora and in-ground hydrology

The project is creating a lifestyle development in Linbro Park to the east of Sandton that will have access to the Gautrain, internal open spaces with wetland lakes. Exceed Africa’s services have been provided to integrate the vast wetland on the site along with the exiting farm dams into an attenuation facility, wetland sustaining open space amenity that will improve living quality of the development as well as the internal and downstream environments with improved runoff water quality.

Beverley Remedial School (The Bridge, Fourways)

  • Client – Advtech
  • Duration – June 2016 to June 2017
  • Contractor – Sheer Projects and Civtek Civil Engineering Contractors
  • Development – Remedial School in Beverley Johannesburg
  • Engineering
    • Civil Services – internal and external water, sewer, stormwater, platforms and roads with upgrades on Robert Bruce and William Nicol Roads
    • Structural Services – foundations, concrete slabs and columns and retaining walls
    • Environment Services – the site was previous open and sparsely vegetated creating highly silt laden runoff from the site to the adjacent developments with the positioning of grass channels, sports fields and an attenuation facility the downhill residents no longer have silty runoff to handle and the discharges controlled runoff to the area piped stormwater systems.

The project created a remedial school in the upper market area of Fourways / Beverley in Johannesburg, with the intent to allow learners needing extra assistance to ultimately achieve their dreams.

Varsity College Sandton Expanded Parking

  • Client – Advtech
  • Duration – March 2016 to October 2016
  • Contractor – Civtek Civil Engineering Contractors
  • Development – Expansion of Varsity College Parking
  • Engineering
    • Civil Services – stormwater and roads
    • Structural Services – large keystone retaining walls up to 7m high and the new exit guardhouse
    • Environment Services – the site was previous open and sparsely vegetated creating highly silt laden runoff from the site to the adjacent developments with the positioning of grass channels, sports fields and an attenuation facility the downhill residents no longer have silty runoff to handle and the discharges controlled runoff to the area piped stormwater systems.

This project utilised existing college site area to formalise parking allowing more students to park on site and out of the surrounding road reserves. With the existing buildings, adjacent neighbours and watercourse, the space restrictions required evaluation of the parking layout holistically to ensure maximisation of the parking bays generated. The attached photos demonstrate the existing parking bay alignments and the new bay alignments. Exceed Africa in the process also unlocked further parking area for the client in the process through close liaison with the Johannesburg Roads Agency. This will allow further expansion of the parking in the near future to be confirmed once the regulatory processes have been completed.

Founders Hill College

  • Client – Advtech
  • Duration – August 2016 to February 2018
  • Contractor – Lexkon Construction
  • Development – Upgrade and conversion of offices and industrial site into school facilities, with sports facilties and parking
  • Engineering
    • Civil Services – stormwater, roads and platforms
    • Structural Services – retrofitting of existing buildings for new functionality
    • Environment Services – stormwater mitigation to levels conducive prior to the school development with no change to downstream catchments

This project took and existing industrial site and converted into school facilities from pre-primary to high school. The process involved converting warehouses buildings and offices into classrooms, administration facilities and a hall with the addition of the required parking, tennis and pool facilities.

Crawford Lonehill Prep Hall Foundation Lifting

  • Client – Advtech
  • Duration – June 2016
  • Contractor – Uretek
  • Development – Upgrade and conversion of offices and industrial site into school facilities, with sports facilties and parking
  • Engineering
    • Structural Services – Reinforcement of the foundations of the school hall
    • Project Management Services – Safety and contractor management to reinstate the stability of the hall and its foundations

This project required an alternative approach to reinforcing the foundations of hall. Although rock layers exist below the buildings on the site the rock surface is sloped and it has fill on it between the rock and buildings. Due to the nature of that old fill and the extreme rains experienced that year the hall was noted to have moved 15mm in one night. The foundations needed to be stabilised and the hall levels reset. Uretek provided a specialised product that is high pressure injection pumped into the foundations to fill any voids and and lift the building. The work took approximately a week and the cracks shown in the building were seen to have closed during the process, even though minor paint and patch work was required to properly restore the internal finishes.

Trinity Randpark Ridge New Pre Primary Building

  • Client – Advtech
  • Duration –April 2016 to October 2016
  • Contractor – Sheer Construction
  • Development – Construction of New Pre Primary Building and upgrade of sewer and stormwater services
  • Engineering
    • Civil Engineering Services – Design and monitoring of civil services to new facilities
    • Structural Services – Design of the foundations and structural members of the school building

Trinity Randpark Ridge New Pre Primary Building

  • Client – Advtech
  • Duration –April 2016 to October 2016
  • Contractor – Sheer Construction
  • Development – Construction of New Pre Primary Building and upgrade of sewer and stormwater services
  • Engineering
    • Civil Engineering Services – Design and monitoring of civil services to new facilities
    • Structural Services – Design of the foundations and structural members of the school building

Trinity Randpark Ridge obtained the house adjacent to their existing school and converted into a pre primary. The refurbishment, extension and conversion works in this project were just phase 1 of the pre primary creating essentially the first leg of a what will ultimately be a U-shaped building to facilitate the school registration requirements.

Winchester Villas Beams Replacement (Winchester Hills)

  • Client – Balwin
  • Duration – March 2018 to June 2018
  • Contractor – Balwin Maintenance
  • Development – Construction of New Pre Primary Building and upgrade of sewer and stormwater services
  • Engineering
    • Structural Services – Design of the new beams and methodology for installation in occupied residential buildings

Winchester Villas is one of Balwin’s oldest and first residential developments and was constructed at a time when lintels were commonly utilised for beams. Having no SABS rating they can be unpredictable in the long term. In this case they had started sagging with the brick walls above them cracking and dropping with the existing lintel beams. Balwin wishing to maintain the integrity of their development and reputation sought Exceed Africa’s structural engineering services to replace the garage and veranda beams, on the eight town house complex units, with a long term solution. The new beams consist of I-beams that have been well installed to keep the appearance of the complex and ensure no future issues with safety and the beams going forward.