Exceed Africa
  •  Home
  •  About us
  •  Services
  •  Projects
  •  Blog
  •  Contact us
Select Page
The Reid (Linbro Park Ext 169) Phase 1

The Reid (Linbro Park Ext 169) Phase 1

by Jason Webster | Aug 27, 2018 | Civil Engineering, Environmental Engineering, Roads, Stormwater, Structural Engineering, Wetland

The Reid, Linbro Park Extension 169 aerial view of 23 August 2018 show Phase 1 ready for occupation as at end of August 2018 with Phase 2 construction well underway and the Phase 3 platforms.  ...
Kathstan Parking Area Water Flow Testing

Kathstan Parking Area Water Flow Testing

by Jason Webster | Jul 24, 2018 | Civil Engineering, Environmental Engineering, Roads, Stormwater, Traffic Management

Testing the water flow in the parking area seems small and insignificant, however the small things sometimes make the biggest difference long term – no ponding, correct flow and getting into the piped system inlets and out of the low point overland flow points...

Recent Posts

  • The Reid (Linbro Park Ext 169) Phase 1
  • Kathstan Parking Area Water Flow Testing
  • Kathstan College Phase 1 Parking and Stormwater
  • Randpark Ridge Ext.105
  • Crawford Sandton Stormwater and Sewer Upgrade

Recent Comments

    Archives

    • August 2018
    • July 2018
    • June 2018

    Categories

    • Bulk Water
    • Civil Engineering
    • Environmental Engineering
    • Project Management
    • Road Closure
    • Roads
    • Stormwater
    • Structural Engineering
    • Traffic Management
    • Traffic Signals
    • Wetland

    Meta

    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    • Facebook
    • LinkedIn
    • RSS

    © 2019 Exceed Africa | Powered By Open Circle Solutions