With Phase 1 nearing completion quickly, the parking asphalt surface is in place and the subsoil drains to the existing fields are being installed. The existing fields form the attenuation facility in phase 2 and the subsoil drains will negate bogging of the field surface after rainfall events. The parking surface will remain unmarked for 6 weeks to allow the surface oils to dissipate before the road markings applied otherwise the markings will discolour and not adhere properly to the surface.