Kathstan Parking Area Water Flow Testing

Kathstan Parking Area Water Flow Testing

by Jason Webster | Jul 24, 2018 | Civil Engineering, Environmental Engineering, Roads, Stormwater, Traffic Management

Testing the water flow in the parking area seems small and insignificant, however the small things sometimes make the biggest difference long term – no ponding, correct flow and getting into the piped system inlets and out of the low point overland flow points...
Kathstan College Phase 1 Parking and Stormwater

Kathstan College Phase 1 Parking and Stormwater

by Jason Webster | Jul 17, 2018 | Civil Engineering, Environmental Engineering

With Phase 1 nearing completion quickly, the parking asphalt surface is in place and the subsoil drains to the existing fields are being installed. The existing fields form the attenuation facility in phase 2 and the subsoil drains will negate bogging of the field...
Randpark Ridge Ext.105

Randpark Ridge Ext.105

by Jason Webster | Jul 13, 2018 | Civil Engineering, Environmental Engineering

As part of our Environment Engineering specialist services Exceed Africa in March 2018 through May 2018 was able to assist Reeflords in unlocking their Randpark Ridge Extension 105 development known as Orchid Ridge. The site was obtained with approved development...
Crawford Sandton Stormwater and Sewer Upgrade

Crawford Sandton Stormwater and Sewer Upgrade

by Jason Webster | Jul 9, 2018 | Civil Engineering, Environmental Engineering, Project Management, Structural Engineering

Exceed Africa was pleased to solve an environmental contamination problem creating a health risk to the students of Crawford Sandton, Upstream of the school sewer blockages were contaminating the stormwater in the open stormwater channel. The stormwater channel was...

Recent Posts

  • Trinity College Glenvista
  • The Reid (Linbro Park Ext 169) Phase 1
  • Kathstan Parking Area Water Flow Testing
  • Kathstan College Phase 1 Parking and Stormwater
  • Randpark Ridge Ext.105

Recent Comments

    Archives

    • August 2020
    • August 2018
    • July 2018
    • June 2018

    Categories

    • Bulk Water
    • Civil Engineering
    • Environmental Engineering
    • Project Management
    • Road Closure
    • Roads
    • Stormwater
    • Structural Engineering
    • Traffic Management
    • Traffic Signals
    • Wetland

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    • Facebook
    • LinkedIn
    • RSS

    © 2021 Exceed Africa | Powered By Open Circle Solutions