Exceed Africa is pleased to be part of Balwin’s project team for the lifestyle development, The Reid. The residential development will create 1294 residential units on a site with a large wetland and existing farm dams. The wetland and farm dams will be retained and rehabilitated to form an open recreational space amenity as well as the stormwater attenuation for the site. As the dams are in-stream they will attenuate the runoff events up to and including the 1:100 year event while allowing the baseflow from upstream catchments to pass through. Even the boundary walls have been structurally designed to accommodate the 1:100 year flows with safety margins for possible blockages and security issues. Exceed Africa is also the structural engineer for the residential blocks, the gatehouse, boundary wall and clubhouse facilities for the development.